Wednesday, July 24, 2013

July 24th - Toilet Construction

Authors: Radhika and Ananya
This morning for Swadhyaya, we did something different instead of meditation. We went to a local Krishna temple and saw a river associated with Kapila muni.

Along the way, we saw picturesque mountain landscapes. Our jaws dropped at the sight of the mountain ranges. Today was our last day of toilet construction. Luckily the weather was on our side and we were able to get a lot done. We had to get bricks and transport them all the way to the construction area (which was a little hard). Aside from that, we had to mix cement using lots of sand and water.
The door got put up and slowly the walls were constructed. It was an amazing feeling to see the finished product after our three days of hard work -- even though we weren't able to put up the roof.

No comments:

Post a Comment